Up to 33 kV
Electrical
Substations, cables, overhead lines and street lighting.
We build and test networks and put them into service.

Capability at a glance
- Voltage range
- LV · 11 kV · 22 kV · 33 kV
- TAQA work groups
- 7 qualified
- Competency certificates
- 6 HV and LV work permits
Scope of works
What we self-perform
- Distribution substations Switching stations, RMUs, packaged units
- LV, MV and HV cables to 33 kV
- Jointing to 33 kV, including live LV terminations
- Overhead lines, 11/22 kV Build, relocate, dismantle
- Transformers to 33 kV Distribution, power, dry, oil
- Substation earthing Primary and distribution, emergency works
- Street lighting and traffic signals
- Low current Fibre, CCTV, fire alarm, ICT, security
- Testing and commissioning
- Network maintenance Emergency and corrective, Long Term Rate Agreements (LTRA)
From the field






Portfolio
Work in this division
-
Substation earthing systems
Earth mat replacement, riser bonding and exothermic joints on energised substations, with utility-witnessed tests.
-
11 kV network reinforcement
Trenching, ducts, cable pulling and jointing to 33 kV, tested before energisation, under TAQA LTRA.
-
Testing, commissioning and condition monitoring
Scheduled VLF, partial discharge, insulation resistance, turns ratio and relay tests on primary and distribution substations.
-
Switching stations and packaged substations
Turnkey as main contractor, from civil works and switchgear to energisation and handover.
-
Street, bollard and traffic lighting
Poles, LED luminaires, foundations and feeder pillars for arterial roads, communities and the cycle network.
-
MV and LV distribution for developments
Residential and commercial projects, from supply and civil works to testing and handover.
Get in touch
Have a package to award?
Get a quotation within one working day.
Phone: +971 2 666 0581 · Email: info@almaidanagcm.ae